• 미래를 향한 비전

    Vision for the future

[Boiler Tube Replacement]

[Boiler Tube Replacement]

1. Client: POSCO

2. Work Description: Deaerator Eva + Eco Tube Replacement

3. Scope of Supply: E (Engineering)+P(All Material)+C (Construction)

[Damper Replcement]


1. Client: Unison/KOSPO

2. Work Description: FGD 4 sets of Damper Replacement 3. Scope of Supply: C (Construction)

[Expansion Bellows (Metallic) Replcement]


1. Client: TNB RAMACO

2. Work Description: Bellows Non-metal to Metallic replacement

3. Scope of Supply: E (Engineering)+P(All Material)+C (Construction)

[Pump Replcement]


1. Client: GS EPS

2. Work Description: Sump Pump Replacement

3. Scope of Supply: E (Engineering)+P(All Material w/o pump)+C (Construction)

[ST DOG BONE/Non-Metal Replcement]


1. Client: Oseong, Dangjin, Seoul Power Plant

2. Work Description: Condenser DOG BONE & GT Bellow replacement work 3. Scope of Supply: P(All Material)+C (Construction)

[Piping Replcement]


1. Client: Unison/GS DONGHAE

2. Work Description: Flash Tank Piping Line Extension Project 3. Scope of Supply: C (Construction)

검색