Vision for the future
[Boiler Tube Replacement]
1. Client: POSCO
2. Work Description: Deaerator Eva + Eco Tube Replacement
3. Scope of Supply: E (Engineering)+P(All Material)+C (Construction)
1. Client: Unison/KOSPO
2. Work Description: FGD 4 sets of Damper Replacement 3. Scope of Supply: C (Construction)
1. Client: TNB RAMACO
2. Work Description: Bellows Non-metal to Metallic replacement
1. Client: GS EPS
2. Work Description: Sump Pump Replacement
3. Scope of Supply: E (Engineering)+P(All Material w/o pump)+C (Construction)
1. Client: Oseong, Dangjin, Seoul Power Plant
2. Work Description: Condenser DOG BONE & GT Bellow replacement work 3. Scope of Supply: P(All Material)+C (Construction)
1. Client: Unison/GS DONGHAE
2. Work Description: Flash Tank Piping Line Extension Project 3. Scope of Supply: C (Construction)